Services
Temporary Site Lighting
Utilising energy efficient LED lighting we can provide site wide safety lighting, including internal access/egress routes, stairwells, lift shafts, external access/egress routes, hoarding lighting and tower crane lighting.
Combine LED lighting with our bespoke SMART LIGHTING and you can be assured of an efficient, environmentally friendly construction site lighting installation.
The Options
SITE LIGHTING SOLUTIONS
LED Safety & Emergency Lighting
- 20w long life LED array
- Substantially reduced energy consumption
- Compact form factor
- Lightweight
- Robust design
- Lower maintenance costs
LED Floodlighting
- Substantially reduced energy consumption whilst maintaining high output
- Compact form factor
- Lightweight
- Reduced risk of injury in manual handling and in particular when working at high level
- Lower maintenance costs
LED Festoon & Bulkhead Lighting
- 10w long life LED array
- Substantially reduced energy consumption
- Substantially brighter
- Guard options
- Lower maintenance costs
- Battery powered bulkheads
Energy Saving SMART LIGHTING
- Bespoke lighting transformers
- Reduced energy wastage
- Reduced environmental impact
- Reduced energy costs
- Increased BREEAM rating
Templec Services: Serving the Construction Industry, Reducing Costs & Delivering Sustainability for 25 Years
Cost Saving SMART Lighting
Adopting Templec SMART Lighting will enhance your LED lighting installations, ensuring your lighting is only on when it is needed.
ISO 14001 Accredited
Committed to helping our clients reduce their environmental impact.
Over 25 years experience
A trusted contractor for the UK’s largest construction companies since 1994
Committed To Safety
Committed to safe working for our employees and those of our clients.
FULL SITE SERVICE
ALL OUR SITE SOLUTIONS
Temporary Power
Temporary Lighting
Temporary Plumbing
Temporary Alarms
Temporary CCTV
Activity | Typical locations/ types of work | Average illuminance (lux) | Minimum measured illuminance (lux) |
---|---|---|---|
Movement of people, machines and vehicles(a) | Lorry park, corridors, circulation routes | 20 | 5 |
Movement of people, machines and vehicles in hazardous areas; rough work | Construction site clearance, excavation and soil work & loading bays | 50 | 20 |
Work requiring limited perception of detail(b) | Kitchens, factories assembling large components, potteries | 100 | 50 |
Work requiring perception of detail(c) | Offices, sheet metal work, bookbinding | 200 | 100 |
Work requiring perception of fine detail(d) | Drawing offices, factories assembling electronic components, textile production | 500 | 200 |
Testimonials
Words From Our Customer
Alan Bell
Project ManagerWe worked with Templec for over 4 years on Bromley South, their overall performance has been very good, they have been understanding & adaptable to changing conditions and we would be happy to work with them again.
Mel Lambert
M&E ManagerThe project has been demanding at times on everyone involved and we rely heavily on our subcontractors to perform well for us. I am pleased to say Templec have been excellent in this regard and look forward to working with them again in the near future.
Adam Goldsworthy
Project SurveyorTemplec have been involved with out £100m mixed use development since the enabling works and I have been impressed with their level of professionalism and attentiveness throughout the project. Our project has been very challenging and complex and Templec have generally provided a first class service.
John Vince
Commercial ManagerTemplec have impressed right from the start of the project, they have maintained the same knowledgeable site personnel and nothing has been too much trouble for them, a very good service in all respects.
WE’LL CALL YOU
GET YOuR QUOTE
GET IN TOUCH
FOR FULL TECHNICAL SPECIFICATIONS, TAILORED SITE SOLUTIONS & SITE SURVEYS. CALL NOW
Whether you need Site Power, Plumbing, Lighting our a bespoke service our team are on hand to help